Stephen Teeuwen
Technical sectretary
Benin was one of the first countries in the region with environmental codes that contained E(S)IA provisions. The decree of 2001 firstly defined the ESIA procedures and introduced SEA in the legislation. The Agence Béninoise pour l’Environnement (ABE), the current ESIA agency, had been established even earlier. A rather complete body of legal texts and manuals was in place, and ESIA (for private sector investments) became a widely accepted practice. Around 2010, however, the ESIA system was losing strength: funding for ABE decreased, while simultaneously political leadership seemed to have lost its attention for ESIA.
In May 2015, the Council of Ministers of Benin approved an updated Decree on Environmental Assessment. In 2017, a renewed decree on Environmental Assessment procedures was published.
The ESIA procedure in Benin involves a screeing process, a scoping process, the preparation of a draft EIS and its publication. Then a public hearing to discuss the EIS is held and subsequently the decision by ad hoc committee on whether a certificate of environmental conformity is issued for the project is taken. Thereafter, follow-up assessments and audits are done. A flowchart produced by ABE and ABPEE gives an overview of the different stages of the ESIA process and how they relate to each other.
Important outputs of the EIA process in Benin are: Starting document for screening, ToR, EIA report, public hearing report, technical report as result of review process, environmental conformity certificate.
Screening process
At the start of the EIA process, the proponent shall submit a written notice to the Ministry in charge of the Environment requesting the issuance of a environmental compliance certificate for his project. The ABE then verifies if the project is actually subject to the EIA procedure and checks if it is subject to a full EIA or a preliminary EIA and the Ministry responsible for the environment communicates the decision to the proponent.
Decree 2017-332 specifies which activities are subject to EIA and which level of assessment is required. Two types of EIAs are prepared: full EIA’s and preliminary EIA’s.
Appendix 1 of Decree 2001-235 provides lists of projects that are subject to EIA. Screening thresholds are used to define whether a full or a preliminary EIA is required. Projects whose environmental effects are limited, can easily be limited or can be avoided through the application of mitigation measures, are generally subject to a preliminary EIA. A full EIA has to be done for projects as listed in Annex 1 and for projects subjected to preliminary EIA but involve hazardous areas or environmentally sensitive areas as specified in Appendix 2 (confirmed in annex of decret 2017).
The environmental law states in Article 89 that after the submission of the written notice for screening, the Ministry that is responsible for the environment indicates to the proponent the nature, scope and extent of the study that he must prepare. The law contains no information on whether this decision must be published.
Sensitive areas
Projects that involve environmentally sensitive areas as defined in the Annex of the Decret 2017-332 always are subject to a full EIA.
Contents of the starting document
The environmental law states that the general nature of the activity has to be described in the written notice that supports the screening phase.
Timeline Screening
Not specified.
Scoping process
According to the General guidelines, the proponent develops the ToR on the basis of general and potentially available sectoral EIA guidelines. In case of a lack of competence, the proponent may request support for doing so from the ABE. The proponent then submits the ToR to ABE for approval.
Contents of the scoping document
Not specified.
Timeline scoping
According to decree 2015-382, the ToR are approved within 7 days after reception.
Assessment process
According to Decree 2017-332, the initiator of the project is fully responsible for the assessment study, but he may be supported by an agency or an independent consultant. The guide states that the general impact study must be designed and prepared using a scientific method in order to identify and assess the impact of the project on the quality of the environment. Once the initiator considers the EIA report to be complete, he submits it to the minister responsible for the environment and demands a environmental conformity certificate.
Contents of the EIA report
Article 36 of Decree No. 2017-332 specifies the content of the EIA report. It must describe the anticipated environmental impacts of the project and must include at least the following elements:
Any project that results in the involuntary physical or economic displacement of at least 100 people is the subject of a Resettlement Action Plan (RAP).
Section 4 of the General Guide provides detailed guidance for the drafting of each of these sections of the EIA Report and for the presentation of the report in general.
The Guide also requires the inclusion of the Technology Accident Risk Management Plan.
Decree 2017-332
Accreditation of consultants
An approval for the exercise of activities relating to environmental assessments is issued by the Minister in charge of the environment. Accreditation is granted to any person who meets certain conditions, such as having a degree in higher education in Environment, having participated in the realization of at least five ESIA reports, etc.
Articles 44-49, Decree no. 2015-382 of 09 July 2015
Review process
After the EIA report is submitted to the Ministry, it is made public.
Subsequently, the review process of the EIA report is launched. The General Guide states that the EBA conducts the review in consultation with the ministries and other relevant bodies that are involved or interested in the project.
For any in-depth EIA, EBA sets up two ad hoc working groups for the review of each project: one with experts and one with representatives of the administration.
The objective of the review is to provide objective arguments as to the acceptability of the project in terms of environmental quality, which will highlight the project’s strengths and the drawbacks associated with its implementation. The EBA also takes into account the report of the public hearing before finalizing its technical opinion.
The EBA then makes a decision on whether the report is acceptable. The results of the review process are presented in a technical report that also contains recommendations to the Minister regarding the decision-making process as to whether the Environmental Compliance Certificate should be issued.
Loi No. 98 – 030 du 12 février 1999 portant loi-cadre sur l’environnement, decret 2017-332
Review expertise
Through the publication of the draft report and the formation of specialized working groups for the review, external parties can be involved in the process in an ad hoc committee.
Timeline Review
ABE has 3 months time to review the EIA report after the file has been judged to be complete. Delays are allowed if additional information is needed for the review.
Décret no. 2017- 332 du 06 juillet 2017
Integration of ESIA into decision-making
The environmental law states that if the EIA report is found satisfactory by the minister in charge of the environment, he will issue an environmental conformity certificate. Such a certificate is required before the project is approved by any competent authority.
The minister in charge of the environment is responsible for the decision whether an environmental conformity certificate is issued.
Included in the conditions of the environmental conformity certificate are project characteristics as modified during the EIA process, measures planed for avoiding, mitigating or reducing impacts and the Environmental Management Plan.
Decision justification
No information. The EIS is published, but the law 89-030 does not require that the environmental conformity certificate or conditions of the project must be published.
Timeline decision-making
Article 12 of Decree 2017-332 mentions that once the ABE has found the report to be acceptable or the available amount of time for review is passed, the Ministry has 5 days to take the decision on whether the environmental conformity certificate is issued.
Possibilities for appeal
No information.
Compliance monitoring
The General Guidelines state that the entire project, both during the construction phases of the operation, must remain under observation in order to ensure that the decision by the minister is respected. Also, the adequacy and effectiveness of implemented mitigation measures has to be checked. The ABE oversees the implementation of the Environmental Management Plan.
The terms of the monitoring program are developed by the developer in collaboration with the ABE and other departments and agencies that are involved in the project implementation. They are included in the Environmental Management Plan that accompanies the environmental conformity certificate.
No external monitoring requirements are given in the EIA regulations or guidelines.
Non-compliance penalties
If the conditions of the certificate are not met, the authorization for it can be withdrawn.
Public participation requirements for ESIA process stages
The public has the possibility to participate in the EIA process during the review stage.
The public can demand a public hearing through sending an written request to the minister in charge of the environment. Once this request is accepted and a public hearing takes place, they can express their opinion verbally.
Decree 2001-190 provides guidance on the organization of public hearings. Furthermore the general guidelines provide detailed information regarding the public hearing procedures in chapter 7.
Timeline for public comments
No information.
Access to information
After it was submitted, the EIA report is available to the public. Also, the public hearing report published by the minister.
Report data will be disseminated through the media (mainly radio) and by NGOs. The reports are stored at ABE and can be viewed by any person or entity that expresses the need for it. After a public hearing was found to be necessary, an notice is gazetted through the press and a public display in the region that is affected by the project. It provides general information about the planned public hearing. A copy is also given to ABE and to the respective regional authorities.
The public hearing report published by the minister and it also is archived in the ABE and can be accessed by the public there.